Port Services

General Cargo Handling

Mottama Ports operate various kind of G/C including cement, construction materials, agricultural products, logs and so on.

Container Handling

We delivered various container cargoes from Thilawa International Ports to SPT and HTY for the re-distribution of the cargo to respective warehouse.

Ramping & Stevedoring

Cranes, Heavy Loaders, Backhoes, Excavator, Trailers and other Roll On-Roll Off Machinery can use Ramping Service to Customers’ Project Sites with minimum risk.

Mottama Port Particulars

Name Length Width Total Port Area Draft DWT
Mottama Port
(Shwe Pyi Thar)
183 M 52 M 5.1 Acres 5 M 4000 MT
Mottama Port & ICD
(Hlaing Tar Yar)
195 M 60 M 9.4 Acres 5 M 4000 MT

Capacity & Specification

Berthing Wharf SPT HTY
Length 183m with apron width 52m 195m with apron width 60m
GC Handling Area 122m x 50m (With 55 MT Crawler) 130m x 60m (With 55 MT Crawler)
Container Area 61m x 50m
(With 40 MT Fixed Liebherr Crane)
65m x 60m
(With 40 MT Fixed Liebherr Crane)
Back Up Area 2.7 Acres 6.3 Acres
Total Port Area 5.1 Acres 9.4 Acres
Draft Allowance 5 m 5 m
Deadweight 4000 MT 4000 MT
Estimated Load/Unload of GC 800 Tons per day (General Cargo) 800 Tons per day (General Cargo)
Estimated Load/Unload of Container 100 TEUs per day (Container) 100 TEUs per day (Container)